Company overview
Dongfang Electric International Corporation
USCC
9151000020183938X6
Id2
510000000000271
Name
Dongfang Electric International Corporation
Former names
四川东方电力设备联合公司
Chinese Name
东方电气集团国际合作有限公司
Entity type
Limited Liability Company (Sole Legal-Person Ownership, Non-Natural Person)
Authorized Capital
¥76,352
email@dongfang.com.cn
Phone
+862887898614
Representative
罗志刚 (Luo Zhi Gang)
Incorporation date
22 May 1985
Country
China
Primary goods traded
- 30.7% — Electric generating sets (850231)
- 26.0% — Lignite (270210)
- 19.9% — Boilers (840290)
- 14.0% — Coal (270112)
- 9.4% — Turbines (840690)
Main Trading Partners
| Partner | Type | Total Value | Percentage |
|---|---|---|---|
| PT Kaltara Power Indonesia | buyer | $39,841,000 | 11.27% |
| PT Dongfang Electric Indonesia | buyer | $33,714,958 | 9.54% |
| PT Indominco Mandiri | seller | $28,802,530 | 8.15% |
| PT Obi Sinar Timur | buyer | $18,064,016 | 5.11% |
| PT Bukit Asam | seller | $12,480,314 | 3.53% |
| Unknown | seller | $12,072,523 | 3.41% |
| PT Poso Energy | buyer | $7,589,045 | 2.15% |
| PT Prima Layanan Niaga Suku Cadang | buyer | $6,539,999 | 1.85% |
| PT Sinarbaru Wijayaperkasa | seller | $5,587,890 | 1.58% |
| PT Bukit Baiduri Energi | seller | $5,314,946 | 1.50% |
Loading chart...
Loading chart...
Trade Data
| Data Source | HS Code | Description | Buyer | Buyer Country | Seller | Seller Country | ||
|---|---|---|---|---|---|---|---|---|
| 30 October 2021 | ID | 27021000 | Batubara Lignit (Indonesian Steam Coalinbulk) Arb 4034 Cal Adb 5530Tm 37,17T.Ash 5,06 T.Sulfur 0,13Klasifikasi Batubara <4700 | Dongfang Electric International Corporation | CN | PT Borneo Indobara | ID | $9,864,855.00 |
| 6 July 2022 | RU | 2702100000 | Brown Coal (Lignite), Non-Pultured, But Not Agglomered, Energy Brand 3B . | Dongfang Electric International Corporation | CN | Olntsevsky Coal Mine Llc | RU | $9,291,700.00 |
| 20 May 2024 | VN | 84069000 | Rotor And Synchronized Accessories Of Steam Turbine (03 Rotor Packages, With Attached Goods List). Goods That Have Been Put Into Operation Since 2017 Are Temporarily Exported To China For Repair And Maintenance. | Dongfang Electric International Corporation | VN | Power Generation Corporation 1 | VN | $9,188,261.00 |
| 29 July 2024 | VN | 84069000 | Rotor And Synchronized Accessories Of Steam Turbine (03 Rotor Packages, With Attached Goods List). Goods Have Been Put Into Operation Since 2017 And Re-Imported After Going To China For Repair And Maintenance. | Power Generation Corporation 1 | VN | Dongfang Electric International Corporation | CN | $9,188,260.00 |
| 23 May 2022 | RU | 2702100000 | Brown Coal (Lignite), Non-Pultured, But Not Agglomered, Energy Brand 3B . | Dongfang Electric International Corporation | CN | Olntsevsky Coal Mine Llc | RU | $8,728,370.00 |
| 26 October 2022 | RU | 2702100000 | Brown Coal (Lignite), Non-Pultured, But Not Agglomered, Energy Brand 3B . | Dongfang Electric International Corporation | CN | Olntsevsky Coal Mine Llc | RU | $7,150,460.00 |
| 18 May 2022 | VN | 85023120 | 1 Part Ht Wind Turbine Generator: Wind Turbine Propeller, Model: B760, Material: Fiberglass Reinforced Plastic, Manufacturer: Dongfang, Under Item I4 Dm No: 06/Hqla-Nv, Item 4 Dm No. : 09/Dm-Btr | Branch Construction Jsc | VN | Dongfang Electric International Corporation | CN | $6,607,735.48 |
| 7 September 2021 | VN | 85023110 | Propeller D4500-155 (1 Set Of 3 Pieces) And Components (1 Part Of Wind Energy Conversion Generating Set D4500-155 Capacity 4250Kw) (Bladed4500-155and Accessories), Under Item 4 Dmhhnk No. 14/Dmtb Dated August 27, 21, New 100 % | Hung Hiep 1 Jsc | VN | Dongfang Electric International Corporation | CN | $6,435,800.00 |
| 21 September 2021 | ID | 27011900 | Indonesian Steam Coal | Dongfang Electric International Corporation | CN | PT Bukit Asam Persero Tbk | ID | $6,410,250.00 |
| 3 August 2021 | ID | 27011900 | Indonesia Steam Coal | Dongfang Electric International Corporation | CN | PT Bukit Asam Persero Tbk | ID | $6,070,063.50 |
0 of 20 row(s) selected.